500l Electric Brewing System
- HBETBREW
- Shangdong, China
- Within 40days
- 50sets/month
Service & Guarantee of 500L Electric brewing system:
- Provide beer production technology and brewing formula, equipment design, installation and debugging, and personnel training service;
- Providing 3D and CAD layout drawing within 5working days after get buyer’s building plan.
- Provide 3years complete warranty for tanks body and life-time maintenance service; All of the accessories and auxuliaries facilities are guaranteed for one year;
500L Electric brewing system
Configuration of 500L electric brewing system:
Item | System | Spec. | Qty |
500L Electric brewing system | Miller | 150-200KG/H | 1set |
Brewhouse | 500L (Mash tun/lauter, kettle/whirlpool) heat exchanger and all parts | 1set | |
500L hot water tank with all parts | 1pcs | ||
Fermenters | 500L Fermenter | 6pcs | |
Cooling system | 1500L glycol tank with all parts | 1pcs | |
3HP chiller | 2sets | ||
CIP cleaning system | 50L CIP | 1set | |
Controlling system | Control panel | 1set | |
Bottling equipment | Rinser, filling, capping, labelling, air compressor | 1set | |
Installation | One person | 25days |
Production Standard of 500L Electric brewing system:
1. The inside of tank is pickled and passivated. Surface roughness is ≤0.8um
2. Brewhouse dish head outside is mirror polished, surface roughness is ≤0.8um
3. Welding seams between the dish head, cylinder and cone is mirror polished, surface roughness is ≤0.8um
4. The whole tank of FV and Cooling jacket/steam jacket will be tested by gas, keeping 24hours with 3Bar pressure.
Installation and debugging conditions of 500L Electric brewing system:
1. Before technician arrived in buyer’s local, the buyer should make the Tap water, Steam supply, Power Supply and Building ready for installation.
2. The buyer is responsible for finding a translator locally for easy understanding.
3. Steam pipe between the steam generator and brewhouse/HLT is not provided from seller, the buyer should customize it locally.
4. Cables is not provided from seller, the buy should prepare it locally.
Installation & training of 500L Electric brewing system:
-The seller will send engineer to install the brewery equipment in buyer’s local.
-The buyer is responsible for finding a translator locally for easy understanding.
-The buyer should provide food, room and tickets.
-The seller will be responsible for the visa cost (only one time).
-The service period is about 25days, including assemble the brewery and training the operator, the buyer will be charged USD100 per day for each engineer’s service.
Service & Guarantee of 500L Electric brewing system:
- Provide beer production technology and brewing formula, equipment design, installation and debugging, and personnel training service;
- Providing 3D and CAD layout drawing within 5working days after get buyer’s building plan.
- Provide 3years complete warranty for tanks body and life-time maintenance service; All of the accessories and auxuliaries facilities are guaranteed for one year;