500L Micro Beer Brewing Equipment
- HBETBREW
- Shangdong, China
- Within 40days
- 50sets/month
Service & Guarantee of 500L micro beer brewing equipment:
- Provide beer production technology and brewing formula, equipment design, installation and debugging, and personnel training service;
- Providing 3D and CAD layout drawing within 5working days after get buyer’s building plan.
- Provide 3years complete warranty for tanks body and life-time maintenance service; All of the accessories and auxuliaries facilities are guaranteed for one year;
500L Micro Beer Brewing Equipment
Production Standard of 500L micro beer brewing equipment:
1. The inside of tank is pickled and passivated. Surface roughness is ≤0.8um
2. Brewhouse dish head outside is mirror polished, surface roughness is ≤0.8um
3. Welding seams between the dish head, cylinder and cone is mirror polished, surface roughness is ≤0.8um
4. The whole tank of FV and Cooling jacket/steam jacket will be tested by gas, keeping 24hours with 3Bar pressure.
Installation & training of 500L micro beer brewing equipment:
-The seller will send engineer to install the brewery equipment in buyer’s local.
-The buyer is responsible for finding a translator locally for easy understanding.
-The buyer should provide food, room and tickets.
-The seller will be responsible for the visa cost (only one time).
-The service period is about 25days, including assemble the brewery and training the operator, the buyer will be charged USD100 per day for each engineer’s service.
Service & Guarantee of 500L micro beer brewing equipment:
- Provide beer production technology and brewing formula, equipment design, installation and debugging, and personnel training service;
- Providing 3D and CAD layout drawing within 5working days after get buyer’s building plan.
- Provide 3years complete warranty for tanks body and life-time maintenance service; All of the accessories and auxuliaries facilities are guaranteed for one year;