500L Turnkey Brewery Equipment

  • 500L Turnkey Brewery Equipment
500L Turnkey Brewery Equipment
  • HBETBREW
  • Shangdong, China
  • Within 50days
  • 50sets/month

- Free consultation service before, during, and after sales; Layout plan in 3D or CAD drawings of your brewery;
- Round the clock assistance via phone, e-mail, Skype, Whatsapp, MSN, or any other communication method available to the customer;
- The installation period is about 20 days including assembling brewing tanks and training the operator. The buyer will be charged USD 100 per day for each engineer for the extended installation.
- Professional engineers going abroad for the installation, debugging, and training, all the travelling cost and locate food and hotel shall be afforded by the buyer;
- Brewing technology, brewing formula, can be offered available
- Assisting purchased Facilities by seller including bottling system, steam boiler, water treatment, etc should be installed separately. If needed, cost calculate additionally;
- More spare parts are available to offered freely.
- The main equipment have 5 years warranty, auxiliary engine and accessory have 1 year warranty.

500L Turnkey Brewery Equipment 


500L Turnkey Brewery Equipment Configurations

Milling system

Malt miller

300-500kg/h 

1pcs

Brewhouse

Mash tun/ Lauter tank

Volume is 500L, with false bottom, grant, raker with motor

1pcs

Kettle

Volume is 500L, electric heating

1pcs

Whirlpool tank

Volume is 500L


HLT water tank

Volume is 500L, electric heating

1pcs

Includes plate heat exchanger, wort pump, motors, hops filter, yeast adding tank, oxygen device and pipelines

Fermenting

Fermenters

Volume is 500L or 1000L (double batches)

6pcs

BBT(option)

Volume is 500L or 1000L (double batches)

2pcs

Racking arm, spunding valve, pressure gauge, carbonation stone, sample valve

Cooling system

Glycol tank

Volume 1000L or 1500L

1pcs

Cold water tank(option)

Volume 500L, cooled by glycol tank

1pcs

Chiller

5HP, Copeland

1pcs

Cleaning

CIP

50L two tanks, heated by electric, with pump and trolley

1pcs

Controlling

Control cabinet

PLC touch screen or PID controller

1pcs  

 

Service: 


- Free consultation service before, during, and after sales; Layout plan in 3D or CAD drawings of your brewery;

- Round the clock assistance via phone, e-mail, Skype, Whatsapp, MSN, or any other communication method available to the customer;

- The installation period is about 20 days including assembling brewing tanks and training the operator. The buyer will be charged USD 100 per day for each engineer for the extended installation.

- Professional engineers going abroad for the installation, debugging, and training, all the travelling cost and locate food and hotel shall be afforded by the buyer;

- Brewing technology, brewing formula, can be offered available

- Assisting purchased Facilities by seller including bottling system, steam boiler, water treatment, etc should be installed separately. If needed, cost calculate additionally;

- More spare parts are available to offered freely.

- The main equipment have 5 years warranty, auxiliary engine and accessory have 1 year warranty.



CE Certificate
CE Certificate
PED certificate
PED certificate
Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy

close left right