600L Craft Beer Brewery Equipment

  • 600L Craft Beer Brewery Equipment
  • video
600L Craft Beer Brewery Equipment
  • HBETBREW
  • Shangdong, China
  • Within 30days
  • 50sets/month

Free consultation service before, during, and after sales;Layout plan in 3D or CAD drawings of your craft beer brewery equipment;

Assisting purchased Facilities by seller including bottling system, steam boiler, water treatment, etc should be installed separately. If needed, cost calculate additionally.

Brewing technology,brewing formula,can be offered available, More spare parts are available to offered freely.

600L Craft beer brewery equipment 


The main configuration of our standard 600L craft beer brewery equipment is as follows:


-Malt miller: 300-500kg/h crushing ability, double rollers, the distance can be adjusted (1pcs)


-Brewhouse: Two vessels 600L brewhouse with accessories (600L mash tun/lauter tank, 600L kettle/whirlpool tank, operation platform, plate heat exchanger, hops filter, pumps, motors, false bottom, oxygen device and all related accessories)(1pcs)


- Fermenters: 600L /1200L fermenters (with all related pipelines and accessories, such as pressure gauge, spunding valve, solenoid valve, cleaning ball, sample valve, racking arm, PVRV, temperature probe and so on) (6pcs depends on your fermenting time and production request)


- Cooling system: Glycol tank + chiller + cooling pump (1set), you can choose the brand of the chiller, for example Copeland, COOLSOON)


- CIP cleaning system: 50L/100L clean in place, two tanks with cleaning pump and control panel on top


- Control panel: It is customzied based on your automatic degree request, we have the PID and PLC touch screen for your choose. 


- Other related equipment for support: Kegs, keg filler, keg washer, bottle filling line, air compressor, steam generator, beer filter, water treatment and so on.     



Output/Brew

200L

300L

500L

600L

800L

1000L

Brew/Week

2~6

2~6

2~6

2~6

2~6

2~6

Output/Week

400~1200L

600~1800L

1000~3000L

1200~3600L

1600~4800L

2000~6000L

Electric Supply

3phase/380(220, 415,440…)v/50 (60)Hz

Single Phase/ 220(110, 240…)v/50(60)Hz

Heating Source

Electric/Steam

Area Request

>25M2

>30M2

>45M2

>50M2

>60M2

>70M2

Brew master

1

1

1

1

1

1

Tip: 1hl=100liter; 1Gallon=3.7854liter; 1Barrel (BBL) =117Liter


(1).Free consultation service before, during, and after sales;Layout plan in 3D or CAD drawings of your brewery;
(2).Professional engineers going abroad for the installation,debugging,and training,all the travelling cost and locate food and hotel shall be afforded by the buyer;

(3).The installation period is about 20 days including assembling brewing tanks and training the operater. 

(4)Round the clock assistance via phone, e-mail, Skype, Whatsapp, MSN, or any other communication method available to the customer.

(5).Assisting purchased Facilities by seller including bottling system, steam boiler, water treatment, etc should be installed separately. If needed, cost calculate additionally.

(6).Brewing technology,brewing formula,can be offered available
(7).More spare parts are available to offered freely.

 

Product quality testing equipment
Product quality testing equipment
Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy

close left right