8bbl Craft Beer Brewing System Equipment
- HBETBREW
- Shangdong, China
- Within 50days
- 50sets/month
Free consultation service before, during, and after sales; Layout plan in 3D or CAD drawings of your craft beer brewing system equipment;
Round the clock assistance via phone, e-mail, Skype, Whatsapp, MSN, or any other communication method available to the customer;
Brewing technology, brewing formula, can be offered available
8BBL craft beer brewing system equipment
8BBL Craft Beer Brewing System Equipment Configurations:
Milling system | Malt miller | 300-500kg/h | 1pcs |
Brewhouse | Mash tun/ Lauter tank | Volume is 8BBL, with false bottom, grant, raker with motor | 1pcs |
Kettle | Volume is 8BBL, steam heating | 1pcs | |
Whirlpool tank | Volume is 8BBL | ||
HLT water tank | Volume is 16BBL, steam heating | 1pcs | |
Includes plate heat exchanger, wort pump, motors, hops filter, yeast adding tank, oxygen device and pipelines | |||
Fermenting | Fermenters | Volume is 8BBL or 16BBL (double batches) | 6pcs |
BBT(option) | Volume is 8BBL or 16BBL (double batches) | 2pcs | |
Racking arm, spunding valve, pressure gauge, carbonation stone, sample valve | |||
Cooling system | Glycol tank | Volume 16BBL or 20BBL | 1pcs |
Cold water tank(option) | Volume 16BBL, cooled by glycol tank | 1pcs | |
Chiller | 5HP, Copeland | 2pcs | |
Cleaning | CIP | 100L two tanks, heated by electric, with pump and trolley | 1pcs |
Controlling | Control cabinet | PLC touch screen or PID controller | 1pcs |
Service for your project of 8BBL Craft Beer Brewing System Equipment:
- Free consultation service before, during, and after sales; Layout plan in 3D or CAD drawings of your brewery;
- Round the clock assistance via phone, e-mail, Skype, Whatsapp, MSN, or any other communication method available to the customer;
- The installation period is about 20 days including assembling brewing tanks and training the operator. The buyer will be charged USD 100 per day for each engineer for the extended installation.
- Professional engineers going abroad for the installation, debugging, and training, all the travelling cost and locate food and hotel shall be afforded by the buyer;
- Brewing technology, brewing formula, can be offered available
- Assisting purchased Facilities by seller including bottling system, steam boiler, water treatment, etc should be installed separately. If needed, cost calculate additionally;
- More spare parts are available to offered freely.
- The main equipment have 3 years warranty, auxiliary engine and accessory have 1 year warranty.